[Free] 2018(Jan) EnsurePass Braindumps IBM C2010-555 Dumps with VCE and PDF 21-30

Ensurepass.com : Ensure you pass the IT Exams
2018 Jan IBM Official New Released C2010-555
100% Free Download! 100% Pass Guaranteed!
http://www.EnsurePass.com/C2010-555.html

IBM Maximo Asset Management v7.6 Functional Analyst

Question No: 21

A user has created a work order against asset ABC. A technician determines that asset ABC is faulty and it needs to be replaced. The technician replaces asset ABC at the operating location with asset XYZ from a repair location.

What happens after the swap?

  1. Asset locations have been swapped.

  2. Asset identifiers have been swapped

  3. inventory locations of the assets have been swapped

  4. The faulty asset ABC status at the operating location gets updated to OBSOLETE.

Answer: A

Question No: 22

A custom field has been added to the Work Order Tracking application to identify the inspector for environmental impacts of each work order. What type of role is used to assign the work order to the environmental inspector?

  1. Person

  2. Person Group

  3. A set of data related to the record

  4. A set of data related to the login user

Answer: A

Question No: 23

A store manager needs to make changes to an asset via the Move/Modify action. Which of the following changes can be madequot;? (Choose two.)

  1. Features

  2. Storeroom

  3. Asset#39;s location

  4. Class description

  5. Parent/child relationship

Answer: C,D

Question No: 24

A company has a requirement to have labor certificates defined. In which application can this be done?

  1. Crews

  2. People

  3. Certifications

  4. Qualifications

Answer: D

Question No: 25

A company requires that laborers record the actual time they spent on a work order. The

labor hours recorded are not automatically approved and the connection does not want the laborer to have access to the Work Order Tracking application.

Which application would the laborers use?

  1. Invoicing

  2. Time Sheets

  3. Labor Reporting

  4. Activities and Tasks

Answer: C

Question No: 26

A company wants to trigger a PM based on a characteristic type meter. How can this be accomplished?

  1. Create a master PM and link to the characteristic on the Related Records tab.

  2. Create a condition monitoring point and specify the PM on the upper or lower limit.

  3. Create a PM against the asset and specify the meter on the Frequency tab of the PM.

  4. Create an escalation based on the characteristic meter and trigger the PM via an action.

Answer: B

Question No: 27

A vendor requires a payment of 20% of the purchase price when the purchase order (PO) is sent and the company wants to withhold of the payment until 90 days after receiving the item before final payment is made.

How would this be accomplished#39;?

  1. A Purchase Requisition would be created and three invoices would) be generated via the invoicing application One invoice tor 20%. one for 60% and one for 20%

  2. A Price Contract would be created with a payment schedule with an invoice of 20% at the time the PO is Approved, an invoice of 60% at the time the item is received and another invoice for 20% 90 days after receipt.

  3. A Blanket Contract would be created with a payment schedule with an invoice of 20% at the time the PO is Approved, an invoice of 60% at the time the item is received and another invoice for 20% 90 days after receipt

  4. A Purchase Contract would be created with a payment schedule with an invoice of 20% at the time the PO is Approved, an invoice of 60% at the time the item is received and another invoice for 20% 90 days after receipt

Answer: D

Question No: 28

A fixed-schedule PM needs to be set up.

What other setting need to be selected in addition to the frequency value?

  1. Alert Lead (DAYS) must equal 0

  2. Alert Lead (DAYS) must be greater than 0

  3. use Last Work Order#39;s Start Date to Calculate Next Due Date? checked

  4. Use Last Work Order#39;s Start Date to Calculate Next Due Date? unchecked

Answer: C

Question No: 29

A company wishes to track items previously used for maintenance work on assets so they can easily be identified in the future. How can this be accomplished?

  1. Non-Rotating Assets can be listed on the Spare Parts tab on the asset record.

  2. Rotating items can be recorded on the Subassembly table on the asset record.

  3. Non-Rotating items can be recorded on the Spare Parts tab on the asset record.

  4. Consumable items can be recorded in the Spare Parts application against the asset record.

Answer: D

Question No: 30

A company purchased many non-rotating as well as rotating assets and needs to understand the differences between them. Which of the following are true1? (Choose two.)

  1. Rotating assets allow for maintaining an inventory of serialized components

  2. Both asset types allow for maintaining an inventory of serialized components.

  3. Non-rotating assets allow for maintaining an inventory of serialized components.

  4. Rotating assets can be held in inventory prior to moving to an operating location.

  5. Non-rotating assets can be held in inventory prior to moving to an operating location.

Answer: A,E

100% Ensurepass Free Download!
Download Free Demo:C2010-555 Demo PDF
100% Ensurepass Free Guaranteed!
C2010-555 Dumps

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No